Supplying Five Pressure Gauge Models to a Dubai Distributor
A Dubai instrumentation distributor approached us to consolidate five pressure gauge models previously sourced from three suppliers in China. Its priorities were consistent quality, confirmed specifications and clear English markings for warehouse and installation teams.
We worked with the customer’s purchasing and technical teams through sample approval, production and inspection of a 900-unit first order. After completing incoming inspection, the customer ordered another 1,000 units of the two faster-moving models.
Example image unavailable. An internet connection is required.
Samples · 2 per model / 10 unitsPayment · 30/70 T/TDelivery · FOB Ningbo / Incoterms® 2020
10 unitsTwo trial gauges per product
900 unitsFirst bulk order / Five products
45 cartons20 units per carton / 410 kg gross
1,000 unitsRepeat order on 12 August
View all five approved product configurations and MOQs
Item / model
Type / first-order qty
Technical basis
Materials
P01 / Y-100
General Pressure Gauge 300 units
100 mm · 0–1 MPa · Class 1.6 · M20×1.5 bottom connection · Dry
MOQs apply to the same model, range, connection and dial design: P01/P02, 100 units per specification; P03/P04/P05, 50 units per specification. Trial quantities were agreed separately. All five gauges had 100 mm dials, with the accuracy class stated in the technical basis above.
FILE 01 / 15
FILE01/ 15
TRANSACTION RECORD / CLIENT A
First Inquiry: Five Products, Three Existing Suppliers
RECORD DATES11–15 MARCH 2024
RECORD 01.01Email / First contact
The customer wanted fewer suppliers, but this was our first order together.
Client A is a Dubai industrial instrumentation distributor with a local warehouse, supplying equipment manufacturers and maintenance contractors and supporting pump-set and water-treatment packages. Its purchasing manager had about five years of China-sourcing experience and annual pressure-gauge purchases of approximately 5,000–8,000 units, spread across three suppliers.
The five-item inquiry reached us on 11 March at 19:40 Beijing time. Grace replied the next morning rather than issuing a quotation that evening. The customer was looking for consistent quality and clear English markings as well as the opportunity to consolidate purchasing.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Purchasing Manager
Initial five-item inquiry · Subject not recorded
Dear Sales Team,We currently buy gauges from three suppliers in China. Please quote the attached five items for our stock and pump package business. We need consistent quality and clear English markings. Please also advise sample cost and lead time.
RECORD 01.02Application checklist / Technical review
We reviewed the use of each item instead of treating the five models as interchangeable.
Grace asked for the medium, temperature, working pressure and installation conditions by product. The customer’s technical lead returned the application form on 13 March:
P01 / Y-100: clean water and ordinary compressed-air equipment, with media compatible with the steel and copper-alloy materials.
P02 / YN-100: pump sets subject to mechanical vibration. Some equipment also had pressure pulsation, so damping measures would be evaluated separately.
P03 / Y-100BF: process equipment requiring stainless steel wetted parts. The medium, concentration and temperature needed confirmation for each project.
P04 / YE-100: low-pressure, dry air that is non-corrosive to copper alloys; not for direct connection to high-pressure lines.
P05 / YXC-100: high/low alarms in non-hazardous locations. Contact capacity, supply and an intermediate-relay arrangement required confirmation before samples; the contacts would not directly drive high-power loads.
RECORD 01.03WhatsApp / Quotation negotiation
Annual purchasing volume and this order’s quantities led to different price expectations.
The purchasing manager requested an 8% reduction across the first order and free samples and courier service, citing potential annual purchases of 8,000 units. We quoted by the quantity of each individual specification, rather than applying the customer’s total annual demand to a first order with us.
The five-item total of 900 units did not put every item into a 500-unit price tier. Grace explained that increasing P01 and P02 individually was one way to obtain their next quantity-break price. We instead offered a conditional credit for the sample product charges; the courier charge remained payable.
Client A / Purchasing Manager · 14 MAR, 20:25 Beijing time
Hi Grace, I sent our target prices yesterday. Can you confirm whether you can support them? We need to decide which supplier will make the samples.
Our team / Grace · 15 MAR, 09:20 Beijing time
Good morning, Purchasing Manager. I have reviewed the quantities with production. I will send the revised quotation this morning, with the price breaks and sample credit shown separately.
↳ CORRESPONDENCE / CASE RECORD
FROM / Our team / Grace
Quantity breaks and sample credit · Subject not recorded
Dear Purchasing Manager,Thank you for sharing your annual volume. The quotation follows the quantity of each specification in this order. We can credit XXXXX in sample charges against the first qualifying bulk order. The XXXXX courier charge would remain payable.
Sample Order: Two of Each Item and Clear Credit Terms
RECORD DATES18 MARCH 2024
RECORD 02.01Email / Technical attachments / PI
The sample order covered ten gauges with an agreed comparison basis.
The customer confirmed two units of each of the five items. P03 and P04’s custom G1/2 male threads were checked against drawings. For P05, the contact rating, compatibility with the customer’s control circuit, supply, intermediate relay and wiring arrangement were reviewed in writing, with the technical values in a dedicated annex.
The signed attachments defined what the customer would test. The MOQ was also specification-specific: the same model, range, connection and dial design. P01 and P02 required at least 100 units per specification; P03, P04 and P05 required at least 50. Sample quantities were agreed separately.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Purchasing Manager
Sample order instruction · Subject not recorded
Dear Grace,Please proceed with two pieces of each item. Technical Lead has approved the connection drawings and the alarm circuit attachment. Please show the sample credit conditions on the PI.
RECORD 02.02PI clarification
The credit covered the products, not the courier charge.
The customer initially understood the sample credit to include the entire sample invoice. Grace separated the sample product charge and courier charge on the PI. The sample order used 100% T/T advance payment.
The credit applied to an order placed within 90 days after sample approval.
The bulk order had to use the approved specifications, total at least 900 units, and meet each specification’s MOQ.
Only the sample product charge was creditable; the courier charge was excluded.
For this transaction, the credit would be deducted from the bulk balance.
Trial Order: P05 Worked, but Its Terminals Needed Clearer Marking
RECORD DATES20 MARCH–18 APRIL 2024
RECORD 03.01Funds received / Courier / Customer receipt
We registered the order, dispatched ten gauges and awaited the customer’s tests.
We confirmed receipt of the sample payment on 20 March, dispatched the ten units on 26 March with internal sample-inspection records, and the customer received them on 2 April.
RECORD 03.02Customer tests / Email / WhatsApp
The alarm operated, but the technician had to keep returning to the drawing.
The first checks met the agreed indication and connection requirements. P05’s alarm function also worked on the bench. The problem was identifying the common, low and high terminals: the numbering and English instructions did not make the correspondence clear enough.
Grace received the feedback during the afternoon in China. Our technical lead was working on other orders, so she did not immediately promise a completion date. The purchasing manager followed up on 5 April asking for a date for the revised gauges.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Technical Lead
P05 terminal marking feedback · Subject not recorded
Dear Grace,The alarm function worked during our bench check. However, our technician had to refer back to the drawing several times to identify the common, low and high terminals. Please revise the marking and return a sample before we release the bulk order.
Client A / Purchasing Manager · 5 APR 2024
Hi Grace, any update? We need a date for the revised sample, not just confirmation that the team is checking.
RECORD 03.03Video meeting / Revised marking / Replacement dispatch
We changed the labels and wiring guide while retaining the approved electrical arrangement.
At the 8 April video meeting, we agreed that the issue concerned marking and readability. We revised the terminal labels and English wiring diagram, added a matching illustration, and checked the revised gauges against the already approved electrical arrangement.
We dispatched two revised P05 units on 10 April, covering the products and courier cost. They arrived on 16 April. The revision pushed bulk confirmation back by approximately two weeks. When the customer asked us to reserve production capacity early, we estimated capacity but did not start producing an unapproved revision.
↳ CORRESPONDENCE / CASE RECORD
FROM / Our team / Grace
Replacement cost and revision approval · Subject not recorded
Dear Technical Lead,We will cover the replacement samples and courier cost. Please approve both the revised marking and Wiring Diagram Rev2. We will use that signed revision for bulk production.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Technical Lead → Grace
Sample approval — five items / P05 Rev2
Dear Grace,We approve the five sample specifications listed in the attached sheet. For P05, approval applies to the revised terminal marking and Wiring Diagram Rev2 received with the replacement samples.Please do not use the earlier marking for bulk production. Any later change requires written approval before production.
RECORDS / Sample payment · Internal sample test record · Customer feedback, 4 April · Signed sample approval, 18 April, Rev2.
FILE 04 / 15
FILE04/ 15
TRANSACTION RECORD / CLIENT A
Bulk PI: Turning Approval into a 900-Unit Order
RECORD DATES19 APRIL 2024
RECORD 04.01Email / Bulk PI
The purchase quantities and approved revisions were written into the bulk order.
The bulk mix was 300 P01, 300 P02 and 100 each of P03, P04 and P05. The PI identified the approved gauges and drawing revisions, neutral English packing and the agreed 30/70 T/T payment structure.
The sample product charge would be credited separately from the goods value. The deposit was calculated on the full goods value; the eligible credit was deducted from the final balance. Delivery was FOB Ningbo, Incoterms® 2020, with the customer’s nominated forwarder arranging sea freight.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Purchasing Manager
900-unit bulk order instruction · Subject not recorded
Hi Grace,Please issue the bulk PI for the agreed 900 pieces. Keep the approved specifications and neutral English packing. No material or marking substitutions without our written approval.
RECORD 04.02Documentation request
An additional third-party report required a separate scope and schedule.
The customer asked whether an additional third-party report could accompany the goods. Grace explained that the test scope, cost and lead time needed separate confirmation and could not simply be added within the original delivery period. The customer accepted the agreed internal inspection records for this order.
RECORDS / Signed bulk PI, 19 April, Rev2 · Approved samples and technical/drawing revisions.
FILE 05 / 15
FILE05/ 15
TRANSACTION RECORD / CLIENT A
Deposit: Starting the Lead Time from the Agreed Release Conditions
RECORD DATES22 APRIL 2024
RECORD 05.01Customer finance / Our finance / Email
The customer initially counted from signing; we confirmed the actual start under the PI.
We checked the payment account, currency, order reference and actual receipt of the deposit. The customer wanted the 45-calendar-day period counted from the PI signing date of 19 April. Grace referred to the agreed condition: the later of deposit receipt and technical-document signature.
With the release conditions met on 22 April, the inspection-ready target was 6 June. The remittance advice supported the payment check; we confirmed receipt through the bank entry.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Finance Lead
Deposit advice · Subject not recorded
Dear Grace,Attached is the remittance advice for XXXXX. Please confirm receipt and the inspection-ready date.
RECORDS / Deposit remittance advice, 22 April · Factory bank-credit record · Signed PI lead-time clause.
FILE 06 / 15
FILE06/ 15
TRANSACTION RECORD / CLIENT A
Production: Custom Interfaces and the Signed P05 Wiring Revision
RECORD DATES23–29 APRIL 2024
RECORD 06.01Production meeting / Internal coordination
The same thread designation did not make P03 and P04 the same component.
We issued the production order and prioritized material preparation for P03 and P04’s custom interfaces. Model, range, material and drawing revision had to be checked together. P05 was released against the signed Rev2 wiring documents.
Special interfaces and English documentation needed separate control in the production instructions. These were known areas requiring additional attention at our factory.
23 APR 2024 / ENGINEERING MEETING · TRANSLATED RECORD
“P03 and P04 both say G1/2, but material must not be issued on the connection name alone. Check the model, range, material and drawing revision together. Produce P05 to the signed Rev2 wiring documents.”
RECORD 06.02Material preparation / Assembly sequencing / First article
P04 material preparation was expected to take three extra days.
Our production lead changed the assembly sequence so other operations with available material could proceed first. First-article checks were completed on 29 April before moving into assembly and adjustment.
The revised sequence kept the overall plan within the 6 June inspection-ready target.
RECORDS / Production order, 23 April · First-article check, 29 April.
FILE 07 / 15
FILE07/ 15
TRANSACTION RECORD / CLIENT A
Factory Inspection: Three P02 Units Were Reworked and Rechecked
RECORD DATES30 MAY–3 JUNE 2024
RECORD 07.01Inspection / Internal quality record
The deliverable quantity was counted only after reinspection.
We checked indications, appearance, interfaces and P05 contact function under the agreed inspection plan. P02 also received filling-condition and leakage checks. Three P02 units did not meet our internal filling-control requirements and were isolated for rework.
The factory test record retained the rework and reinspection closure alongside the final results for all 900 units.
FACTORY INSPECTION / QUALITY LEAD · TRANSLATED INTERNAL RECORD
“Three P02 units do not meet the internal filling-control requirements. Isolate and rework them first. Count them toward the 900 deliverable units only after they pass reinspection.”
RECORD 07.02Final product checks
Our product checks did not adequately cross-check the separately printed box labels.
Product-performance inspection was completed, but the review of the separately printed outer-box labels did not sufficiently cross-check the model and material descriptions. That gap was exposed at the customer’s later inspection.
RECORDS / Factory test record, 3 June, Rev1 · Three P02 rework and reinspection closures.
FILE 08 / 15
FILE08/ 15
TRANSACTION RECORD / CLIENT A
Ready for Inspection: 900 Gauges, with Cartons Still Accessible
RECORD DATES6 JUNE 2024
RECORD 08.01Email / WhatsApp / Inspection appointment
We reached inspection readiness; shipping release remained a separate step.
The 900 gauges had completed assembly and adjustment. We separated them by model and kept the cartons accessible for opening and inspection, then notified the customer and its appointed China-based representative.
The customer wanted the earliest sailing secured. The nominated forwarder warned that the original plan had a tight cut-off, so Grace requested a provisional booking without promising that the order would meet it.
↳ CORRESPONDENCE / CASE RECORD
FROM / Our team / Grace
Ready for inspection · Subject not recorded
Hi Purchasing Manager,The 900 gauges are ready for inspection today. We have kept the cartons accessible for Inspection Representative’s checks. Please confirm his arrival time and the inspection checklist.
RECORDS / Ready-for-inspection notice, 6 June · Awaiting-inspection quantity list · Batch photos.
FILE 09 / 15
FILE09/ 15
TRANSACTION RECORD / CLIENT A
Customer Inspection: Tracing a P03 Label Error Through the Batch
RECORD DATES7–13 JUNE 2024
RECORD 09.01Customer’s representative / Factory inspection
Two inspected boxes said “Brass Connection”; P03 required 316L wetted parts.
The representative checked quantities, approved samples, connections, performance records, packaging identification and selected measurements against the signed checklist. On P03, two checked outer boxes carried a material description that conflicted with the order.
Our quality lead isolated all 100 P03 units and suspended release of that model. We investigated material-issue and production-batch records, then checked the physical products and retained samples. Changing the labels alone would not establish that the supplied material was correct.
7 JUN 2024 / CUSTOMER INSPECTION REPRESENTATIVE · SITE RECORD
“Two P03 boxes checked carry ‘Brass Connection’. The order requires 316L wetted parts. Please hold the affected lot until the material traceability and all labels have been checked.”
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Purchasing Manager → Grace
P03 inspection finding — evidence required
Hi Grace,We understand that you believe the issue is limited to the box label. Please provide the batch records supporting that conclusion, the quantity affected, and the completed correction checks.We need Technical Lead to review the evidence before we close the finding.
RECORD 09.02Customer follow-up / Batch tracing / Video meeting
The material matched the order; the wrong template had been used on 20 boxes.
When the customer followed up on 10 June, our evidence pack was not yet complete. The purchasing manager questioned whether other specifications might also have mixed labels and said the payment arrangement would need reconsideration.
The investigation confirmed that P03’s wetted parts matched the approved requirement. The label error came from a template for a brass-connection product. Inspection of all 100 P03 boxes identified 20 incorrect labels, including the first two found. We also reviewed the other four products and found no similar mislabeling.
Replace the 20 incorrect outer-box labels and recheck all 100 P03 units.
Submit the matching batch material-issue, assembly and inspection traceability records.
Lock label templates by model, with engineering and quality co-signing.
Have the customer’s representative reinspect, followed by written closure from the technical lead.
We covered the corrective-work costs. The batch records supported this traceability check; they were internal records, not a third-party material-test report. The available margin before the original sailing was reduced further.
↳ CORRESPONDENCE / CASE RECORD
FROM / Our team / Grace → Client A procurement & technical leads
P03 correction completed / reinspection attached
Hi Purchasing Manager and Technical Lead,We checked all 100 P03 units and identified 20 incorrect box labels. Those labels have been replaced. The attached records show the material issue and assembly traceability for this batch.Inspection Representative completed the reinspection today. Please review the attached report and confirm whether this finding can be closed.
RECORDS / Inspection report, 7 June, Rev1 · P03 traceability check, 11 June · CAPA, 13 June, Rev2 · Signed reinspection report.
FILE 10 / 15
FILE10/ 15
TRANSACTION RECORD / CLIENT A
Balance Payment: Resolving the Requested 20% Retention
RECORD DATES14–19 JUNE 2024
RECORD 10.01Email / Balance statement / Customer finance
The customer wanted to retain 20% of the goods value until inspection in Dubai.
Grace sent the reinspection documents and balance statement after written closure of the quality issue. The purchasing manager requested that 20% of the invoice value remain unpaid until the goods had passed incoming inspection in Dubai, changing the original 30/70 T/T arrangement.
We reviewed what additional support we could provide: reinspection images, batch photos, the packing list and a contact channel for quality issues after arrival. We also offered another video review before sealing.
Client A / Purchasing Manager · 14 JUN 2024
Hi Grace,Given the labeling issue, we would like to retain 20% of the invoice value until our incoming inspection in Dubai. We can pay the remaining amount before shipment.
Our team / Grace
Hi Purchasing Manager,I understand why you are asking. Inspection Representative’s reinspection and Technical Lead’s written closure are attached. We can arrange one more video review before sealing. For this first order, the agreed balance remains payable before shipment. The amount due is XXXXX after the sample credit.
Balance statement
Amount / basis
Goods value
XXXXX
Less deposit received
XXXXX · 30% of goods value
Less sample product-charge credit
XXXXX · Courier charge excluded
Balance due before shipment
XXXXX
RECORD 10.02Terms accepted / Finance approval / Bank receipt
The payment terms were agreed before the money reached our account.
The purchasing manager accepted the original payment terms on 17 June, but customer finance had missed that day’s approval batch. Payment was expected on the 18th; we confirmed actual receipt on the 19th. On 18 June, Grace followed up while bank processing was still incomplete and did not treat the processing notification as credited funds.
↳ CORRESPONDENCE / CASE RECORD
FROM / Our team / Grace → Client A procurement & finance leads
Balance payment and revised shipping plan
Hi Purchasing Manager,Thank you for confirming the original payment terms. The balance due is XXXXX including the XXXXX sample credit.The forwarder can plan the next sailing once receipt is confirmed. We will send the final packing list after weighing and sealing. Please let us know when your bank releases the payment.
Client A / Finance Lead · Payment-processing stage
Dear Grace,The payment has been released for processing. Please allow us to send the bank advice later today. We understand the booking will need to follow the actual receipt date.
RECORDS / Balance statement, 14 June, Rev2 · 19 June funds-receipt confirmation · Revised sailing arrangement.
FILE 11 / 15
FILE11/ 15
TRANSACTION RECORD / CLIENT A
Final Packing: Checking Each of the 45 Cartons Before Sealing
RECORD DATES20 JUNE 2024
RECORD 11.01Packing area / Warehouse / Forwarder coordination
We reconciled model, carton number, count, weight and shipping mark carton by carton.
We used neutral English product boxes, connection protection caps, dividers and moisture-resistant bags. Different products stayed in separate cartons, with 20 units per carton. P03’s label recheck records were filed with the packing documents.
The forwarder requested final weights in advance. We provided the final figures after weighing rather than allowing estimated figures to enter the shipping documents.
20 JUN 2024 / QUALITY LEAD · TRANSLATED PACKING RECORD
“File the P03 label review with the packing records. Match each carton number to the list, complete the check, then seal it. Do not release on the total carton count alone.”
Item
Carton nos.
Cartons
Units / carton
Net / gross per carton
P01
01–15
15
20
7 / 8 kg
P02
16–30
15
20
9 / 10 kg
P03
31–35
5
20
10 / 11 kg
P04
36–40
5
20
7 / 8 kg
P05
41–45
5
20
8 / 9 kg
TOTAL
01–45
45
900 units total
365 kg net / 410 kg gross total
Each carton measured 55 × 34 × 28 cm; combined volume was approximately 2.356 m³. Keeping models separated supported warehouse receipt, tracing and later checks.
RECORDS / Final packing list, 20 June · Carton-number and shipping-mark checks · P03 label review record.
FILE 12 / 15
FILE12/ 15
TRANSACTION RECORD / CLIENT A
Sea Freight: Correcting the Draft Before the B/L Was Issued
RECORD DATES21 JUNE–12 JULY 2024
RECORD 12.01Ningbo loading / Nominated forwarder / Document review
A missing word in the notify-party name was corrected before final issue.
The customer’s nominated forwarder arranged the shipment, loaded at Ningbo on 21 June. Grace checked the B/L draft, commercial invoice and packing list, and obtained customer confirmation before the final transport documents were issued.
The customer found that the notify-party warehouse name was missing a word. We corrected the draft before final issue. The transport document was issued on 24 June, recording the 21 June on-board date.
↳ CORRESPONDENCE / CASE RECORD
FROM / Our team / Grace → Client A Purchasing Manager
B/L draft review · Subject not recorded
Hi Purchasing Manager,Please check the consignee and notify-party details in the attached B/L draft. The shipment contains 45 cartons, 410 kg gross. Kindly confirm before the document cut-off.
RECORD 12.02Arrival at Jebel Ali
The goods arrived at port; warehouse receipt came later.
The goods arrived at Jebel Ali Port on 12 July. The customer arranged customs clearance and pickup. The invoice kept goods value, the sample credit and the net payable separate so finance and the customs agent could reconcile them; declaration handling was for the customer and its agent to confirm.
RECORDS / Commercial invoice, 21 June · B/L draft, Rev2 · Final packing list. The source’s simulated B/L identifier is not presented as an actual shipping credential.
FILE 13 / 15
FILE13/ 15
TRANSACTION RECORD / CLIENT A
Warehouse Receipt: Carton 28 Was Dented and Held for Inspection
RECORD DATES16 JULY 2024
RECORD 13.01Customer warehouse / WhatsApp / Email
All 45 cartons arrived, but one needed a separate opening check.
After clearance, the customer received all 45 cartons into its warehouse. The warehouse first checked carton count, exterior condition and carton numbers. Carton 28, containing P02, had a dent at one corner and was separately identified as awaiting inspection.
The customer photographed it and arranged to open it with the technical lead the next day. Receipt of the correct carton count was kept separate from product acceptance.
Client A / Purchasing Manager · 16 JUL 2024
Hi Grace,All 45 cartons are in our warehouse. Carton 28 has a dent on one corner. We have photographed it and will open it with Technical Lead tomorrow.
RECORDS / Warehouse receipt, 16 July · Signed 45-carton receipt · Carton 28 exterior photos.
FILE 14 / 15
FILE14/ 15
TRANSACTION RECORD / CLIENT A
Incoming Inspection: Closing Receipt and Recording the Next Improvement
RECORD DATES17–19 JULY 2024
RECORD 14.01Customer quality team / Warehouse
The agreed checks covered all five products, with extra attention to the damaged carton.
The customer compared the products with approved samples, labels and technical attachments and checked connections, appearance, indications and P05 alarm function. The routine sample covered 90 units across all five models. Separately, all 20 P02 units in carton 28 were opened and checked for appearance and leakage.
No visible product damage or leakage was found in carton 28. P03 labels matched the approved revision, and the P05 terminal markings were clear to the technician.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Technical Lead → Grace
Incoming inspection feedback · Subject not recorded
Hi Grace,The gauges in carton 28 show no visible damage or leakage. The agreed incoming checks are complete. P03 labels match the approved revision, and the P05 terminal markings are clear to our technician.
RECORD 14.02Acceptance closure / Improvement list
P04’s low-pressure warning was carried forward as an improvement, not a changed acceptance condition.
The customer felt P04’s outer box needed a more prominent low-pressure-use reminder. Its label complied with the approved version, so both parties recorded the additional warning as a later-order improvement rather than retroactively changing this order’s acceptance requirements.
The incoming inspection was closed without a product-replacement request. Packaging feedback and the low-pressure reminder remained on the improvement list.
RECORDS / Incoming inspection record, 19 July · Routine 90-unit sample · Separate full opening check of carton 28 · Follow-up improvement list.
FILE 15 / 15
FILE15/ 15
TRANSACTION RECORD / CLIENT A
Repeat Order: Stock Issues Supported 500 More of P01 and P02
RECORD DATES9–12 AUGUST 2024
RECORD 15.01Warehouse issue records / Early installation feedback
The next order followed product movement rather than repeating the entire first mix.
By 9 August, the warehouse had issued 180 P01 units and 210 P02 units to customers or package work. These were stock movements, not proof that every issued unit had completed long-term operation. The technical lead reported no connection-mismatch complaints from the first installed products.
P03, P04 and P05 still had stock available, so the next purchase focused on the faster-moving P01 and P02.
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Purchasing Manager → Grace
Repeat requirement · Subject not recorded
Hi Grace,P01 and P02 are moving faster than the other items. Our warehouse can identify the ranges without opening every box, and the first installation teams have not reported connection issues.Please quote 500 pieces each, using the approved specifications. Keep the label approval step in the production schedule.
RECORD 15.02Quotation / Further discount request / Order confirmation
The customer requested another 3%; we retained the applicable 500-unit tiers.
The purchasing manager asked for a further 3% reduction in addition to the lower quantity-tier prices. Grace explained that each item already qualified for its 500-unit tier. The customer accepted those prices and asked us to prioritize scheduling and keep label review in the production plan.
The repeat order retained the approved specifications, 30/70 T/T and FOB Ningbo. The sample credit had already been used on the first order and was not repeated. Lead time would be confirmed for the new order instead of carrying over the first order’s dates.
Item
First-order issue record by 9 Aug
Repeat quantity
Unit price / amount
P01 / Y-100
180 units
500 units
XXXXX / XXXXX
P02 / YN-100
210 units
500 units
XXXXX / XXXXX
TOTAL
390 units issued
1,000 units ordered
XXXXX
↳ CORRESPONDENCE / CASE RECORD
FROM / Client A / Purchasing Manager → Grace
Repeat order — P01 and P02
Hi Grace,Please proceed with 500 pieces each of P01 and P02 at the agreed prices. The range labels have helped our warehouse separate stock, and Technical Lead has closed the first shipment inspection.The earlier labeling issue caused extra work for both sides. Please keep the double-check in place for this order.
RECORDS / Stock-movement record, 9 August · Signed repeat purchase order, 12 August, Rev1.
Established 28 April 2002 · Approximately 60 employees · Approximately 3,000 m² of production and warehouse space, with assembly, adjustment, inspection and packing positions. Products include pressure gauges, pressure transmitters, pressure controllers and thermometers.
Factory self-inspection records can be provided. Certification and type-approval scope is checked against the relevant documents; additional third-party reporting has its own scope and lead time.
CONTACT US / PRODUCT INQUIRY
Tell Us About Your Purchasing Requirements
Provide your contact details and product requirements so we can discuss selection, samples and pricing with you.