Supplying Diaphragm Pressure Gauges to a Vietnam Equipment Integrator

A chemical equipment integrator in Ho Chi Minh City approached us for 100 diaphragm pressure gauges. The customer needed to confirm compatibility with its process and cleaning conditions, as well as installation access around an existing equipment bracket.

We worked with its purchasing and technical teams to revise the connection geometry, approve the sample and complete the first order. Following incoming acceptance and approximately five weeks of observation on 12 installed gauges, the customer confirmed a separate 1,500-unit order for a new mixing-equipment project.

CUSTOMER PROFILEChemical equipment integrator in Ho Chi Minh City, Vietnam
PRODUCTS SUPPLIEDYN-100ML diaphragm pressure gauges with revised connection geometry
FIRST ORDER100 units · Incoming acceptance completed in February 2026
REPEAT ORDER1,500 units · Order signed and deposit received in March 2026
FILE01/ 15

Initial Inquiry: Establishing Why a Diaphragm Arrangement Was Needed

2025-11-02 to 2025-11-04

We received the requirement and identified the missing information.

Khôi's email reached us at 17:40 Beijing time. He requested a quotation for 100 units, asked whether he could buy two samples first, and attached a photo of the equipment connection.

We acknowledged receipt that evening. We could provide pricing, but could not yet confirm the wetted materials and sealing configuration: the medium composition, operating temperature, cleaning conditions and installation dimensions were incomplete. Separating the medium from the measuring element with a diaphragm does not make every seal material or isolation liquid suitable.

We began by listing the missing information. Lena sent the formal quotation at 11:20 Beijing time the next day and asked the customer's engineer to provide the service-condition form and a dimensioned connection drawing.

CASE CORRESPONDENCE
Our Export Sales · Lena Chen → Mr. Khôi

RE: Inquiry — YN-100ML, 100 pcs

Dear Mr. Khôi, Thank you for considering us for this project. Our quotation is attached, including quantity breaks for 100, 200 and 500 units. Before we confirm the sealing materials and isolation liquid, please ask your engineer to complete the service-condition form. The medium name alone may not describe its concentration, additives or cleaning exposure. Please also send a dimensioned connection sketch showing the sealing arrangement and space around the gauge. We can offer two paid samples before the 100-unit order. Best regards, Lena Chen
Customer / Khôi

Your price is much higher than the ordinary pressure gauges we buy locally. If both show 0–1.0 MPa, what are we paying extra for?

Our team / Lena

The diaphragm assembly separates the process medium from the measuring element. Its suitability still depends on your service conditions. If your application does not require this arrangement, we should review that before you pay for samples.

The customer wanted pricing clarified; we still needed complete service-condition information.

We provided quantity-break pricing for single orders of at least 100, 200 and 500 units, valid for 15 calendar days. Changes to special configurations required a new quotation. Khôi compared our quotation with ordinary pressure gauges purchased locally, then followed up on WhatsApp, noting that we had asked several technical questions without reducing the price.

The customer was comparing prices for the same measuring range, while we still needed to establish whether the application required a diaphragm arrangement. We maintained the quotation at that stage. Lena compiled a one-page service-condition checklist, and An took over technical communication. We agreed to complete the service-condition and drawing confirmation before placing the sample order.

Connection photo

Equipment connection photo supplied by the customer

Customer inquiry email excerpt

Customer inquiry email excerpt
FILE02/ 15

Two Gauges Ordered for Testing: Credit Terms Confirmed in the PI

2025-11-05

We explained the costs of the diaphragm assembly, wetted materials, assembly and inspection, and asked Engineer Zhou to confirm the actual requirement. After An returned the service-condition form, Zhou approved proceeding to sample validation in writing, with bulk approval subject to testing using the actual medium and cleaning process. The specific material combination and its applicable conditions were retained in the order's technical annex.

CASE CORRESPONDENCE
Customer · Khôi → Lena

Two samples: written confirmation of credit conditions requested

Dear Lena,Please issue the PI for two samples. We need written confirmation that the sample product charge can be deducted from the first order. Please also clarify whether the courier charge is refundable.
Our team / Lena

The sample product charge (amount withheld) will be credited against one bulk order of at least 100 units of the same approved configuration, placed within 60 calendar days after sample approval. The courier charge (amount withheld) is excluded. The credit will be shown separately on the bulk PI.

Khôi also wanted the courier charge credited. We explained that this was an incurred third-party expense and maintained that it would not be credited; the customer accepted. The sample PI listed the charges for two products and courier service separately. The customer signed and returned the sample PI and arranged full advance payment.

We and the customer confirmed the sample range, connection drawing, and the sealing and isolation-liquid configuration following technical review. The technical annex retained the specific material combination. Bulk approval still required validation with the actual medium and cleaning process.

Sample PI and product-charge credit conditions

Sample PI and product-charge credit conditions

Customer email confirming the courier charge and sample PI conditions

Customer email confirming the courier charge and sample PI conditions
FILE03/ 15

Payment Received, Gauges Dispatched and Revised Connection Approved

2025-11-06 to 2025-11-24

We registered the sample order after payment was received.

The sample payment covered two products and courier service. We released the sample order after confirming receipt of funds, dispatched two units on 10 November, and the customer received them on 13 November.

The thread fitted, but the gauge we supplied did not leave enough tool access.

The two samples were dispatched on 10 November and received on 13 November. On 16 November, An returned marked photos: the gauge could be threaded in, but the equipment bracket obstructed the wrench and prevented proper tightening. He made clear that thread engagement alone was insufficient for bulk approval.

The photos we originally received did not show the space behind the bracket. The issue was now specific: G1/2 designated the thread, but the sealing face, engagement length and space around the wrench flats also had to be checked together.

Customer / An · 16 November

Dear Lena,The thread engages, but our technician cannot tighten the gauge properly because the wrench flats are too close to the bracket. Please see the marked photos. We cannot approve the bulk order based only on thread engagement.

Our team / Lena · Approximately 4 hours later

Dear An and Khôi,We understand the issue. Please send the bracket clearance dimensions and the required tightening access. Zhou will review a revised lower-body drawing. We will confirm manufacturability before offering a replacement sample.

We covered this replacement sample and its courier charge.

Responsibility was not agreed immediately. Khôi asked us to cover the replacement sample and courier charge. We considered the customer's original information incomplete as well, and the parties disputed responsibility. Lena ultimately proposed a specific arrangement: we would cover this one replacement sample and courier charge, while the customer would complete the installation drawing and sign RevB. Any subsequent dimensional change would be reviewed separately.

We made the customer's engineer's written approval of the revised sample a prerequisite for producing the 100-unit bulk order. Our email of 17 November listed the dimensions to be checked and the conditions for keeping bulk production on hold.

CASE CORRESPONDENCE
Our Export Sales · Lena → An / Khôi

Sample installation issue — revised connection drawing

Dear An and Khôi, We have reviewed your marked photos. The current arrangement does not provide the tightening access required by your bracket layout. Attached is Drawing RevB. Please check the wrench-flat position, installation envelope and sealing interface against your equipment. Once you approve the drawing, we will make one replacement verification sample at our cost and cover the courier charge. Bulk production will remain on hold until you approve the revised sample in writing. Any further dimensional change will require another review. Best regards, Lena

We dispatched one replacement on 19 November, and the customer received it on 23 November. On 24 November, trial installation, reading comparison, and the agreed medium-contact and cleaning-cycle observations were completed. No leakage or abnormality was found under those test conditions. An signed the following approval:

Approved for this project configuration and the documented test conditions.Approval covered this project configuration and the documented test conditions; long-term operation would be monitored separately.

Connection geometry and tool-access dimension comparison

Connection geometry and tool-access dimension comparison

Sample packing photo

Sample packing photo
FILE04/ 15

Bulk Order Confirmation: Unit Price, Quantity and Payment Split

2025-11-25 to 2025-11-27

We negotiated the unit price and advance-payment proportion with the customer.

After sample approval, Khôi confirmed a first order of 100 units and requested the 500-unit price tier with only a 20% deposit, without committing to an annual quantity. We proposed an adjusted quotation subject to the approved configuration, one delivery and 30/70 T/T. The sample product-charge credit would be listed separately, and future orders would be requoted against their actual single-order quantities.

Following negotiation, both parties confirmed the unit price and 30/70 payment terms, and Nam approved the payment arrangement. On 27 November, we and the customer signed the bulk PI and technical annexes, separately listing the product total, sample product-charge credit, net amount payable, deposit and balance.

FILE05/ 15

Bulk Deposit: Bank Advice Date and Lead-Time Start Are Different

2025-11-30 to 2025-12-01

We started the lead time as agreed in the PI after confirming receipt of the deposit.

On 30 November, Khôi sent the deposit bank advice. We first acknowledged the bank notification, then had finance verify the funds separately. The deposit was credited on 1 December. With the approved documents already on file, the conditions for releasing the order to production were then met.

Khôi initially counted the lead time from 30 November. Lena referred to the PI clause stating that it began when funds were credited, and confirmed the target inspection-ready date of 28 December.

FILE06/ 15

Production Start: Locking Drawings, BOM and Serial Numbers

2025-12-02

We withdrew the old RevA printout when it appeared during the start-up check.

We checked the RevB dimensioned drawing, RevC specification, BOM and approved sample records, locked the wetted materials, connection, sealing and isolation-liquid configuration, then scheduled welding, assembly, filling and calibration adjustment. Production staff brought out a RevA printout; Zhou identified it during the start-up check, withdrew it and recorded it as obsolete.

The 100 products were assigned serial numbers CH-LC2512-001 through CH-LC2512-100. We emailed the customer to use RevB and RevC for installation review. Any subsequent configuration change could affect cost and the inspection-ready date.

FILE07/ 15

Factory Inspection: Retaining Readjustment and Cleaning Records

2025-12-21 to 2025-12-24

We recorded three readjustments, two cleaning corrections and the subsequent inspection results.

We checked appearance, dimensions, zero, indications on increasing and decreasing pressure, sealing and labels using the order-approved methods, with results linked to serial numbers. Three units required indication readjustment during initial inspection, and two required cleaning inside the glass. After correction, our internal records showed all 100 units passing factory inspection.

We sent the inspection summary to the customer, with individual calibration records to accompany the acceptance pack, and clarified that these were factory records; third-party verification was not included. After the customer's later inspection found abnormalities, we reinvestigated reinspection following post-final-inspection adjustments and the nameplate revision checks.

FILE08/ 15

Bulk Production Complete: Ready for Inspection, Not Yet Released

2025-12-28

The customer wanted same-day delivery to the forwarder; we retained the next day's inspection.

We sent full-lot photos, the serial-number list and the ready-for-inspection notice, confirming that 100 units were available for Long's factory inspection on 29 December. The goods remained in the clean inspection holding area, without final export cartons sealed. Final packing would follow acceptance and payment release.

Khôi wanted the goods sent directly to the forwarder's warehouse that day. We explained that customer acceptance was not yet complete and requested confirmation of Long's arrival time and the agreed checklist. Both parties retained the scheduled inspection.

FILE09/ 15

Customer Inspection: Shipment Hold, Full-Lot Reinspection and Closure

2025-12-29 to 2025-12-31

The customer's inspection found abnormalities; we suspended release and investigated the causes.

Long checked identification and appearance on all 100 units, then selected 20 for dimensional and performance review as agreed for this order. The revised installation dimensions were correct. However, units 017 and 064 showed zero offsets of approximately +0.020 MPa and +0.025 MPa respectively, exceeding the agreed ±0.016 MPa limit. Six nameplates on units 041–046 also had incorrect connection suffixes; the physical connections complied with RevB.

Khôi questioned the difference between our internal records and the customer's inspection findings: "If the factory's full inspection records showed acceptance, why did our inspection still find problems?"

INSPECTION EXTRACT / CUSTOMER INSPECTION DATA SUMMARY
017 / Zero offset≈ +0.020 MPaExceeds agreed limit
064 / Zero offset≈ +0.025 MPaExceeds agreed limit
Order zero-offset limit±0.016 MPaConditions agreed for this order only
041–046 / NameplatesIncorrect suffixes on 6 unitsPhysical connection complies with RevB
Customer / Inspection feedback

Dear Lena,We cannot release the lot today. Two sampled units failed the agreed zero check, and six nameplates do not match the approved artwork. Please provide containment, corrective actions and reinspection evidence before requesting acceptance.

Our team / Lena · Approximately 2 hours later

Dear Khôi and An,We accept the hold. The complete lot has been isolated. We will recheck zero and calibration on all 100 units, verify every nameplate against the approved artwork, and provide serial-number-based results. No unit will be released before your representative closes the findings.

The missed reinspection was our responsibility.

The investigation record was specific: the two gauges had been adjusted after internal final inspection without the required reinspection. An obsolete nameplate file had also been mixed in, and inspection had checked the range but missed the connection suffix. These issues occurred on our side.

We isolated the complete lot and froze shipment, repeated the relevant performance checks on all 100 units, replaced the six incorrect nameplates and checked all nameplate details on all 100 units. We retained the original records and linked the new results to serial numbers, adding reinspection sign-off after adjustment and a label revision check. We covered the corrective work and Long's additional half-day inspection cost.

On 31 December, Long reviewed every nameplate, retested the two originally failed units and selected another 20. No further related nonconformities were found. An approved closure in writing, while our contractual quality obligations remained in force. The lot received acceptance approval at that point.

On-site dimensional measurement and drawing review photo

Photo of workers measuring the pressure gauge connection and checking the drawing
FILE10/ 15

Balance Payment: Terms, Receipt of Funds and the Missed Consolidation

2026-01-04 to 2026-01-08

After corrective action, the customer still wanted to retain 10% until arrival.

When we requested the balance payment, Khôi said his director wanted to pay 60% of the net order amount then and retain 10% until arrival. This was the first order, and inspection findings had just occurred. The customer explained that concern directly in the email.

Customer / Khôi

Hi Lena,After the inspection findings, our director asks to pay 60% now and keep 10% until arrival. This is our first order with your factory, and we need some protection.

Our team / Lena

Hi Khôi,I understand your director’s concern. The findings are closed in the signed reinspection report, and the final serial list is attached. We will retain the agreed 70% balance before release. To support your approval, we can provide packing photos, the final invoice and confirmation of your forwarder’s booking. Please arrange the transfer in time for funds to arrive by 6 January; otherwise, the planned consolidation may be missed.

We covered the corrective work and additional inspection costs. Following balance negotiations, both parties retained the original payment terms, with release after funds were received. On 5 January, Lena was away and replied to the customer's follow-up three hours later; the customer's tone had become more urgent. Internal customer approval finished on 6 January, the transfer was submitted on 7 January, and funds arrived on 8 January, missing the original consolidation. The additional pickup arrangement charge for the rescheduled shipment was borne by the customer and confirmed by email.

FILE11/ 15

Final Packing: Measured Data for 10 Cartons and Packing List Rev2

2026-01-11

Ten units per carton; final documents followed actual weighing.

We boxed each unit, added foam and thread protection caps, and packed 10 units per carton, making 10 cartons in total. Before sealing, we checked carton numbers, serial numbers, labels and actual weights. Carton dimensions were 52 × 32 × 28 cm; total gross weight was 92 kg, net weight 76 kg, and volume approximately 0.466 m³.

Each carton contained an English contents list, and the overall packing list accompanied the handover documents. The warehouse initially included an old draft printout in the handover pack. After review, we replaced every copy with Rev2 and emailed the customer to use the final revision with the forwarder and customs broker.

SHIPPING MARK / CARTON MARKINGS
LIEN CHUAN EQUIPMENT
PO: LC-251127
ITEM: YN-100ML
QTY: 10 PCS
CTN NO.: 01/10
MADE IN CHINA
KEEP DRY / HANDLE WITH CARE

Product packing and packing verification photo

Photo of workers placing pressure gauges in protective foam packaging and checking packing records
FILE12/ 15

Transport: Checking B/L Package Count and Port Arrival Date

2026-01-12 to 2026-01-22

We corrected the B/L package count from 100 PCS to 10 CARTONS.

On 12 January, we handed the goods to the nominated forwarder for consolidation. They were loaded at Ningbo on 15 January under the updated arrangement and arrived at the port in Ho Chi Minh City on 22 January. We completed the agreed FOB delivery and sent the invoice, final packing list, bill of lading and agreed inspection documents.

The first B/L draft put 100 PCS in the package-count field. After reviewing consignee details, package count and cargo description with the customer, we changed the count to 10 CARTONS, retaining 100 gauges in the cargo description. Port arrival and actual receipt at the customer's warehouse were recorded separately.

Transport video

FILE13/ 15

Customer Receipt: Recording the Crushed Corner of Carton 7

2026-01-26

All 10 cartons arrived; the condition inside Carton 7 was still to be checked.

After customs clearance and pickup, the customer's warehouse counted all 10 cartons but found a crushed corner on Carton 7, noted it on the delivery receipt and took photos. Khôi told us they would open it with their engineer the next day and asked us to retain the original packing photos.

The customer first asked whether we could send a replacement carton directly. We requested opening, serial-number and functional checks before determining the actual loss and handling plan. A complete carton count did not establish that the contents were intact. At this point, we had confirmed receipt and the external packaging issue; the internal condition remained to be checked.

Carton 7: external condition and opened packaging

Carton 07/10 showing its exterior, corner close-ups and internal protective packaging after opening
FILE14/ 15

Customer Inspection: Incoming Acceptance and Tracking 12 Installed Units

2026-01-27 to 2026-02-02

Opening and inspection came before incoming acceptance and field observation.

The customer checked quantity, model and labels on all 100 units, inspected all 10 units from Carton 7, and selected 20 for installation-dimension and indication comparison under its internal plan. Foam in Carton 7 was locally compressed, but no damage was visible on the products or glass. Installation fit complied with the approved drawing, and there was no shortage in the 100 units.

One gauge showed a difference of approximately 0.01 MPa on the customer's comparison bench. After checking the reference instrument's condition and test connections, An determined it was within the order's permitted range and made no claim. The customer completed incoming acceptance and put 12 units into the first field installation, recording positions and serial numbers. Incoming inspection supported warehouse acceptance; operation of the 12 installed units would continue to be monitored.

CASE CORRESPONDENCE
Customer · An → Lena

Incoming inspection feedback

Hi Lena,Incoming inspection is complete. Quantity and identification are correct. The ten gauges from Carton 7 show no visible damage, and the inspected units passed our agreed checks. We will continue monitoring the first twelve installed units.
FILE15/ 15

Customer Feedback and Repeat Order: 1,500 Units for a New Project

2026-03-08 to 2026-03-15

The feedback we received was that the brackets no longer needed on-site modification.

An compiled approximately five weeks of operating records for the first 12 units. Within the observed service conditions and the customer's inspection scope, there were no leakage complaints, no on-site bracket modifications were needed for installation, and no post-cleaning indication abnormality required a shutdown. Long-term performance continued to be monitored.

The customer's new mixing-equipment project was also approved, with a repeat order for 1,500 units. Khôi's message referred both to the technical modification and to our handling of the inspection issue:

CASE CORRESPONDENCE
Customer · Khôi → Lena

Feedback and repeat-order requirement

Hi Lena,The revised connection has saved our team from modifying the brackets on site. The first twelve gauges have remained in service without a leakage complaint during our observation period. Your serial-number records also helped us close the inspection issue internally. We now have approval for another 1500 units for the next project. Please quote the same approved configuration. This is a project order, not an annual commitment.

The customer discussed repeat-order pricing with us again. We explained that the original price tiers applied to single-order quantities, not accumulated split orders. The customer accepted this repeat-order quotation. We also reconfirmed that using the same configuration required checking whether the new project's service conditions or approved drawings had changed.

On 12 March, we issued the PI for 1,500 repeat-order units, retaining the previous order's agreed unit price and 30/70 T/T terms, listing the deposit and balance separately, with no further sample-fee credit. On 15 March, the PI was signed and returned and the deposit received. The second order was confirmed and entered technical review.

During this order, we revised the connection body and paid for corrective work and additional inspection following our missed checks. The outcomes we can account for are that the customer did not need to modify the brackets on site, we could provide inspection records for each gauge, and the deposit had been paid for the next 1,500-unit order.

First order accepted into stock100 units
Field observation / No leakage complaints12 units · Approximately 5 weeks
Repeat order / Deposit received1,500 units · Deposit amount withheld